23/03 (Guidelines on The Estimation Procedures for Traffic Management During Construction)

From REAAA Wiki

Jump to: navigation, search

Contents

Table of Contents

C21 NTJ 23-03 Guidelines on the Estimation Procedures for Traffic Management During Construction.pdf
INTRODUCTION

OBJECTIVE

PRACTICES IN ESTIMATING BQ FOR TRAFFIC MANAGEMENT

  • PREVIOUS PRACTICE
  • CURRENT PRACTICE

ESTIMATION PROCEDURES

  • Case 1: Construction On Both Sides On Existing 2 Lane Single Carriageway To 4 Lane Dual Carriageway (Urban Roads)
  • Case 2: Construction On Both Sides On Existing 2 Lane Single Carriageway To 4 Lane Dual Carriageway (Rural Roads)

CONCLUSION

  • APPENDIX A - STANDARD BQ FOR TRAFFIC MANAGEMENT DURING CONSTRUCTION
  • APPENDIX B - BQ FOR THE ESTIMATION QUANTITIES FOR TRAFFIC MANAGEMENT DURING CONSTRUCTION
  • APPENDIX B1- CASE 1:EXPANSION FOR URBAN ROAD FROM 2 LANE TO 4 LANE DUAL CARRIAGEWAY
  • APPENDIX B2- CASE 2: EXPANSION FOR RURAL ROAD FROM 2 LANE TO 4 LANE DUAL CARRIAGEWAY
  • APPENDIX C- DRAWINGS ON TYPICAL APPLICATION OF STANDARD TEMPORARY SIGNS
  • APPENDIX D- NEW TEMPORARY SIGNBOARDS